Continuous Care Unit of Rovisco Pais Hospital - 2.900 [m2]
Building located in Cantanhede county, with 3 floors, designated as Floor 0, Floor 1 and Floor 2. The floors have bedrooms, offices, kitchen and canteen.
Lutche Engineering provided services for:
- HVAC project;
- Energetic Simulation;
- Energetic Certification.
back